Type a command or search the notes. Tab cycles completions. Up and down recall history when blank. Escape dismisses, then leaves the prompt.
MATH
[1251]

Examples from Economic applications

All examples from Economic applications.

Optimal Cobb-Douglas allocation

Maximise

Q(E,L)=AEεL1−εQ(E,L)=AE^\varepsilon L^{1-\varepsilon}

subject to

qE+pL=B.qE+pL=B.

Assume p,q,B>0p,q,B>0. A feasible bundle with E,L>0E,L>0 produces positive output, whereas a bundle with E=0E=0 or L=0L=0 produces zero output. Hence an optimum has E,L>0E,L>0, so the following first-order equations and division are valid.

The multiplier equations are

εAEε−1L1−ε=λq,\varepsilon AE^{\varepsilon-1}L^{1-\varepsilon} =\lambda q,(1−ε)AEεL−ε=λp,(1-\varepsilon)AE^\varepsilon L^{-\varepsilon} =\lambda p,

together with qE+pL=BqE+pL=B.

Divide the first equation by the second. The common factors simplify to

ε1−εLE=qp.\frac{\varepsilon}{1-\varepsilon}\frac{L}{E} =\frac{q}{p}.

Equivalently,

pεL=q(1−ε)E.p\varepsilon L=q(1-\varepsilon)E.

Combining this relation with the budget equation gives

qE=εB,pL=(1−ε)B.qE=\varepsilon B, \qquad pL=(1-\varepsilon)B.

Thus the optimal input quantities are

E=εBq,L=(1−ε)Bp.{ E=\frac{\varepsilon B}{q}, \qquad L=\frac{(1-\varepsilon)B}{p} }.

The firm spends the fraction ε\varepsilon of its budget on capital and the fraction 1−ε1-\varepsilon on labour:

qEB=ε,pLB=1−ε.\frac{qE}{B}=\varepsilon, \qquad \frac{pL}{B}=1-\varepsilon.

The scale parameter AA cancels from the allocation because it multiplies both multiplier equations in the same way.

Here λ\lambda has units of output per currency unit and measures the marginal value of relaxing the budget. Then λq\lambda q and λp\lambda p have the units of the marginal products QEQ_E and QLQ_L: output per unit of capital and output per unit of labour.

This interpretation can be checked directly. The first multiplier equation gives λ=εQ/(qE)=Q/B\lambda=\varepsilon Q/(qE)=Q/B at the optimum. Since both optimal inputs are proportional to BB, the optimal output is also proportional to BB; thus dQmax⁡/dB=Qmax⁡/B=λdQ_{\max}/dB=Q_{\max}/B=\lambda.

The multiplier equations locate a candidate, not by themselves a global maximum. Along the budget line, L=(B−qE)/pL=(B-qE)/p for 0<E<B/q0<E<B/q and

ddElog⁡Q(E,B−qEp)=εE−(1−ε)qB−qE.\frac{d}{dE}\log Q\left(E,\frac{B-qE}{p}\right) =\frac{\varepsilon}{E} -\frac{(1-\varepsilon)q}{B-qE}.

This derivative is positive before E=εB/qE=\varepsilon B/q and negative after it; output is zero at both endpoints. The candidate is therefore the global maximum on the feasible budget segment.

On this page